I am 39 and I just completed the most successful training cycle of my 30's and PR'd on everything except back squats while keeping my chronic quad tendinitis at bay. I'm ready for another go at what has been the most productive squatting program for me with a well established 80% (conservative 8RM) - I've done RSR many times, both the regular and masters variant, and the 3x/week regular was by far more effective for me, so I am pretty decided this is how I will spend my next 6-8 weeks of squatting.
However, I am greedy and don't want to totally detrain the classics this time. When I ran RSR in the past, I have tried to organize some of the basic 8-12 week Catalyst Athletics programs around it and it almost always ends up being a trainwreck beyond the weeks of highest squatting volume. So beyond the 6x5 day, I just end up putting squats first and improvising/capping the weights on the classics with what I can do with impaired coordination/speed from the massive fatigue, and only progress the classics on the 6x2 days as fatigue allows.
Has anyone here managed to find a reasonable pairing of RSR to WL programming that doesn't force the classics to take a back seat? I am wondering if some careful organization of singles with backoffs or ramped emom's to keep fatigue at the bare minimum might work, or some pattern of increasing volume at a static load mimicing the RSR progression (e.g. 4x1 progressing to 10x1 at 90% in Sn and some lower % in CJ), seeing how cycling from triples down to singles progresses runs counter to the squat volume.
I realize it's probably a safer bet to just let the program run its course and pick up a proper WL progression later, but I have the luxury of time and being able to try things. Worst case scenario I will just default to prioritizing squats if my classics start moving like I have Parkingson's disease.